- SPOT MODEL MAKING COMPETITION
- First: Rs 3000/-
- Second: Rs 2500/-
- Third: Rs 2000/-
- Maximum Three students per team
- Size of bridge should be exactly 1m length X0.25m width X 0.75 height.
- Total Time given for construction will be 60 minutes. Once bridge is constructed any addition or alteration will not be allowed.
- Competition will start sharp at 12 o’clock.
- Except New papers, fevicol, Stapler other material is not allowed, if used participant will be disqualified.
- Only 1.5 kg. news papers and small fevical bottle,one thread rill will be provided for each team.
- Top surface of the bridge must be flat. (On this flat surface a pan will be placed)
- Bring your own stapler if required.
- In first round, bridge should be safe for minimum load which will be specified on the day of event.
- In second round in addition to minimum load, sand will be added in the pan to load the beam till it deflects.
- While constructing the bridge minimum use of newspaper, construction in minimum time will be considered while evaluation.
- Team which get maximum points will be winner.
- While pouring sand to measure load if bridge breaks then team will be disqualified.
- 1 point per gram load bearing will be given.
- Registration Form
Construct a bridge which bears maximum load using Newspapers, Gum & Stapler
PRIZES:
RULES:
GUIDELINES